M/S Mirza Chauki Highways Private Limited

Home

4 laning of NH-33 (old NH-80) section of Mirza Chauki to Frakka section from existing km 190.00 to design km 200.75 km (junction at km 3.100 of NH 133B) and from existing km 260.00 to existing km 283.00 (design km 274.33) in the state of Jharkhand (package-II) on Hybrid Annuity Mode.

Road Construction Excellence Through Engineering Precision and Functional Design

Our Vision
We deliver high-quality road construction solutions by combining advanced engineering practices, durable materials, and functional design to ensure safety, efficiency, longevity, and sustainable infrastructure development for communities and growing transportation needs.

Key Plan

001

Key Plan

002

Location Plan

Progress Photographs

Highway & Structure

Proposed Highway & Structure at Glance

Sr. No. Structures/Facilities Unit Details
1
Length of the Project
Km.
24.883
2
Design Speed
Kmph
100
3
Type of Pavement
Flexible Pavement (20 years design life) Flexible Pavement composition approved (MCW, 50 MSA design traffic) 
4
Length of Slip/Service Road
Km.
Slip Road at VUP: 7.176 Km, Connecting Road: 0.351Km. &
Service Road: 6.370 Km.
5
Road Over Bridge
Nos.
None
6
Major Bridge
Nos.
None
7
Interchange
Nos.
1(1x30m + 1x40m + 16x30m)
8
Flyover
Nos.
None
9
VUP
Nos.
4
10
LVUP
Nos.
1
11
SVUP
Nos.
6
12
Minor Bridges
Nos.
7
13
Culverts (Box Culvert)
Nos.
67
the Project

Critical Issues of the Project

Land Acquisition : Land acquisition is a critical component of the project, involving identification, valuation, and lawful procurement of required land parcels. The process includes coordination with government authorities, fair compensation, resettlement measures, and resolution of disputes. Timely completion of land acquisition is essential to avoid construction delays, ensure uninterrupted progress, maintain project schedules, and support successful execution of highway and infrastructure development works.
Approval of COS-01 : Approval of COS-01 signifies formal clearance of construction scope, structural design, and technical specifications in accordance with applicable standards. This approval enables commencement of related works, ensures regulatory compliance, improves coordination among stakeholders, and supports timely execution, quality control, and adherence to project objectives and contractual requirements throughout the construction phase.
Sr. No. Location Original Scope as per CA Scope as per COS
1
89+027
LVUP with RE WALL
VUP with RE WALL
2
124+245
LVUP
LVUP with RE Wall
3
128+115
LVUP
VUP with RE Wall
Backdated Appointed Date : The Concessionaire vide letter no. GBHPL/AIPL/DB_NH114A/2023-24/28 dated 28.12.2023 has requested to consider the appointed date from 26.12.2023 instead of 12.12.2023.
Key Projects

Project Key
Highlights

001

Strategic highway development improving regional connectivity, traffic efficiency, and economic growth through modern engineering standards.

002

Adoption of advanced construction technology ensuring durability, safety, and long-term performance of road and structural works.

003

Compliance with statutory approvals, environmental norms, and quality benchmarks for sustainable infrastructure development.

004

Efficient project management focused on timely execution, cost control, and coordinated stakeholder involvement.

005

Enhanced safety measures, traffic management planning, and minimal disruption during construction activities.

Photo Gallery